24–34 MW modular gas turbine generator sets — on-site and generating in under two weeks.
24 MW ISO Base Rating / 34 MW Combined Cycle
Rapid On-Site Energization Promise
Combined-Cycle Maximum Efficiency (Low Heat Rate)
Bypassing 2030+ OEM Backlogs via Core Fleet Access
Grid queues run 3–5 years. MOD-1 delivers in weeks.
High-efficiency dispatch when the grid falls short.
Black-start capable. No transmission line required.
Gravel pad only. No concrete, no permits.
Hot-swap core exchange at overhaul. Back online in hours, not months.
Integrated SCR. Meets federal and local NOx standards out of the box.

FTAI Aviation brings the world’s largest CFM56 engine inventory. Jereh Group brings the manufacturing muscle.
+





Comprehensive turnkey support from preliminary site feasibility through multi-year operation — maximizing asset availability and uptime.
2 standard DOT truckloads. No oversized permits.
Compacted gravel pad. Integrated hydraulic jacks.
Plug-and-play hookup to gas lines and the 13.8 kV grid.
Automated startup to full load.
Months of downtime become hours — aviation-grade MRO depth applied to power generation economics.
01Scheduled overhaul without extended outage.
02Dedicated global maintenance centers, no supply gaps.
03Heat rate, vibration, emissions, and output monitored in real time.
Reserve engineering resources and production capacity while slots remain open.